One accountable supplier for everything that turns a bare steel tank into a finished, compliant, operating asset. Access systems. Appurtenances. Controls. Cathodic protection. Blast containment. Delivered kitted to your schedule of values.
Every component category a tank contractor typically pieces together from six or eight vendors — engineered, specified, kitted, and delivered from a single source.
OSHA-compliant access and fall protection specified into the drawing set, not fixed in the field.
Every penetration, vent, valve, and instrument on a modern water tank — from a single BOM.
Design schematics and engineering for overall BAS systems.
Corrosion mitigation and grounding materials.
Containment, climate control, and consumables for abrasive blasting.
Ship parts. Send an invoice. Send another invoice when the first shipment was wrong. Leave the contractor to reconcile six submittals from six vendors against one SOV.
Reviews the drawing package. Coordinates one submittal. Kits every component against the contractor's SOV. Delivers on the mobilization schedule. Inspects installed components on site.
Drawing packages reviewed against AWWA D100/D102, OSHA, and NSF/ANSI 61.
Single-source submittal covering every component category.
Materials organized against the contractor's schedule of values.
Scheduled delivery with installed-component inspection.
Active work is heavy on government and utility infrastructure across the Intermountain West and Desert Southwest. When a general contractor bids a tank refurbishment, they can bid our scope as a line item — one supplier, one submittal, one delivery plan.
Tell us about the tank, the scope, and the schedule. We respond with a scoped BOM, submittal outline, and kitted delivery plan.
Start a Project →Tanktrols Design & Supply LLC
4287 Harrison Blvd. #261
Ogden, UT 84403
Intermountain West + Desert Southwest
NSF/ANSI 61 · OSHA · AWWA D100/D102